Fahy More North Td, Bridgetown, Co Clare
Proposed development
To fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, using existing site entrance, including all ancillary site works
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- Not available
Timeline
Application received
1 Mar 2023
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy Storage System (BESS) Compound with associated internal access tracks; Access to the proposed BESS compound will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded as permitted as part of the Fahy Beg Wind Farm (under Clare County Council Ref: 23148 & ACP Ref 317227); Installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent Fahy Beg 38kV substation. The grid code compliance equipment will include: Backup Generator, Neutral Earthing Resistor (NER), Auxiliary House Transformer, Marshalling Kiosks; 3 no. spare parts shipping containers (measuring 12.2 m (L) x 2.4 m (W) x 2.6 m (H)); and Associated ancillary development. Installation of 32 no. Battery Energy Storage Units comprising metal shipping containers housing batteries (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each), and associated ancillary control and ventilation units; Installation of 8 no. Medium Voltage (MV) Inverter Stations comprising metal shipping containers housing the inverter, MV transformer, and an MV-LV room (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each); Installation of 1 no. water storage tank (measuring 5.15 m (L) x 4.15 m(W) x 2.58 m (H)); Construction of 250m of new access tracks; Provision of a crane hardstanding area to facilitate lifting operations on site (280m2); Provision of 10 no. car parking spaces (8 no. standard parking spaces, and 2 no. accessible parking spaces); Reprofiling of the existing cut slope embankment with the erection of a gabion basket retaining wall measuring 75m in length and 2.5m in height, and construction of a reinforced fill slope embankment; Underground electrical and communications cabling; Security lighting, CCTV and communications mast; Provision of 150m of Sound reflective barriers; Security fencing and gates; Drainage system including on-site surface water attenuation ponds; Tree felling of 0.19 Ha (1,890m2) to facilitate required clearance for BESS compound, associated earthworks and drainage infrastructure; Removal of 109m of hedgerow to facilitate development of the BESS compound, and replanting of 109m at perimeter locations; and All associated ancillary site development and vegetation clearance works including landscaping and hedgerow reinstatement. The Applicant requests that the development be
for development which will consist of the restoration of part of an extant sand and gravel quarry to agricultural grassland. The development is necessary to address condition no. 8 & 9 of ABP Ref. 03.QD.0011 and will include importation of inert material and all associated site development works. A Natura Impact Statement (NIS) has been submitted with the planning application
to fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, using existing site entrance, including all ancillary site works
for development which will consist of the restoration of part of an extant sand and gravel quarry to agricultural grassland. The development is necessary to address condition no. 8 and 9 of ABP Ref. 03.QD.0011 and will include importation of inert material and all associated site development works. A Natura Impact Statement (NIS) has been submitted with the planning application.
to construct a two bay double slatted shed with creep area
for the restoration of 3.76 hectares of an extant sand and gravel quarry to agricultural grassland. The development is necessary to comply with condition no. 4 of substitute consent 03.SU.0127 and will include importation of inert material and all associated development works