Shannon Free Zone, Ballycasey Beg, Smithstown Shannon
Proposed development
To erect signage to logistics (warehouse and distribution) building
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 3 Nov 2022
Timeline
Application received
9 Sept 2022
Decision due
3 Nov 2022
Decision: conditional
3 Nov 2022
Grant issued
8 Dec 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for the development at this site at the Townlands of Mogullaan, Crossagh, Rathlaheen South, Culleen, Drumline, and Ballycasey Beg, Co. Clare. The proposed development will consist of an amendment to a previously consented development (Planning Reference 25/260 by Clare County Council) comprising of; (i) the relocation of the permitted IPP substation, (ii) revised 110 kV grid connection infrastructure including the provision of two 110 kV lattice towers, underground cable ducting and associated infrastructure, (iii) amendments to the electrical interface connection arrangement, (iv) the provision of palisade fencing and associated ancillary infrastructure, (v) a minor extension to the permitted development boundary to the west of the site to facilitate the proposed 110 kV lattice tower and associated underground cable infrastructure, and (vi) all associated ancillary works required to facilitate connection to Drumline 110 kV Substation, Co. Clare. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the planning authority during its public opening hours. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee, €20, within the period of— a) 5 weeks, or b) 2 weeks, in the case of a planning application for small-scale solar energy equipment development or development that is the installation of a small-scale non-ground source heat pump. beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions or may refuse to grant permission. For this application the submission period is 5 weeks beginning on the date of receipt by the authority of the application.
for the proposed development which consists of the provision of corporate back-lit signage in the form of a new advertisement structure at ground level to be placed at the north-east side of the roundabout on the Smithstown Road and at the entrance to Shannon Airport Business Park – East. The signage proposal is intended to replicate signage proposals submitted under Clare County Council planning application reference P25-60656 at the opposite side of the roundabout
for development which will consist of the construction of a mixed-use commercial building (Warehouse) comprising a gross floor area of 6,095sq.m. with ancillary office accommodation (1,000sq.m.), new access road off Smithstown Road, new site entrance, loading bays, HGV circulation and parking,122 No. on-site parking spaces, boundary fencing, ESB Sub-Station, demolition of existing derelict structures, relocation of existing overhead power lines, and connection to existing utilities together with ancillary site development works
the construction of an extension consisting of new Reception / Visitors Centre, internal alterations, amendments to entrance hard landscaping & car-parking, signage to building, alterations to existing elevations and all associated site works
of a specialist grout rig testing structure comprising a steel frame surface-bolted to a concrete foundation slab, with rendered block work to the lower section, profiled metal cladding to the upper elevations, an openable single-skin roof, roller shutter and personnel access doors, external signage, and all associated site development works
for (a) 12 no. 2MW Hydrotreated Vegetable Oil (HVO) generators; (b) 6 no. self-bunded 69m3 HVO tanks; (c) 6no. self-bunded 6m3 AdBlu tanks; (d) a 182m2 electrical/control building: (e ) a customer electrical compound complete with a transformer; (f) an ESB compound connected to the existing adjacent 110kV ESB substation situated immediately east of the proposed development; (g) a fuel loading bay complete with a 7,700L forecourt separator; (h) on site surface soakaways; (i) task lighting columns; (j) 3m high perimeter security fencing and compound separation; (k) new road entrance off the R458; (l) all associated internal access roads, car parking, surface water collection, ducting as required to deliver the works. The proposed development will include connection to public water mains. There is no sewer connection required as foul and process waste will be collected in an underground sealed tank and emptied by a specialist waste service provider. An Appropriate Assessment Screening Report has been prepared for the site. The application relates to a development which comprises an activity requiring an industrial Emissions Directive (IED) licence.