Annagh, Miltown Malbay, Co. Clare
Proposed development
For development of 2 No. velux roof windows to front and rear of existing dwelling and to complete conservatory to side of same granted under P07-648 and a private garage
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 25 Sept 2019
Timeline
Application received
1 Aug 2019
Decision due
25 Sept 2019
Decision: conditional
23 Sept 2019
Grant issued
24 Oct 2019
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to RETAIN the demolition of the rear wall and the east and west gable walls of the existing dwelling, and their rebuilding in concrete blockwork and to RETAIN the construction of an access road to the side of the property. This differs from the development permitted under Planning Ref. P24/185 and all associated site development works
to construct a farm building used for the storage of machinery and hay, and not used for housing animals, with all associated site works
for development of 1 no. primary wastewater pumping station at the Armada House and 1 no. secondary wastewater pumping station at the Armada Hotel, Spanish Point County Clare and for the development of a rising main wastewater pipe (c. 4.3kms in length) located within the public road carriageway (L6224, R482 and N67) in the townlands of Leagard South, Dough, Annagh, Caherrush, Emlagh and Quilty West, County Clare. The proposed development includes works within the curtilage of a protected structure, Armada House, formally Mother McCauley House (RPS No. 025) and works to the Bealaclugga Bridge which is a protected structure (RPS No. 185). The proposed development will consist of the following: 1. Provision of 1 no. primary wastewater pumping station at the Armada House, to service the existing Armada Hotel and the existing Armada House; 2. Provision of 1 no. secondary wastewater pumping station at the Armada Hotel, including 2 no. wastewater holding tanks; 3. Provision of a 110mm rising main pipe from the Armada Hotel to the Armada House (c. 240m in length), within the public road crossing the R482 and L6224; 4. Provision of 1 no. 110mm rising main pipe located within the public road (L6224, R482 and N67) from the proposed primary wastewater pumping station at the Armada House to the existing Irish Water foul sewer network at Quilty, which conveys flows to the existing Irish Water Kilmurry Ibrickane Wastewater Treatment Plant (Asset Number: D0536-02). The proposed rising main is c.4.3km in length and located entirely within the public road corridor; 5. Decommissioning and removal of 1 no. existing wastewater treatment plant, existing polishing filter, and existing percolation area at the Armada Hotel; 6. Decommissioning and removal of 1 no. existing wastewater treatment system and percolation area at the Armada House; 7. Provision of 1 no. temporary construction compound at the Armada House for the duration of the works; 8. All associated development and site enabling works and ancillary infrastructure including screening planting, scour valves, air valves,1 no. vent pipe, and 1 no. discharge manhole. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development
for the construction of an extension to existing dwelling to comprise of utility & toilet (to replace existing), kitchen, playroom, wet room, relaxation room and garage with internal modifications to dwelling including ancillary site works
to renovate and change the layout of the existing dwelling, construct extension to the rear of the dwelling, and to install a replacement effluent treatment system all with associated site works
for the refurbishment and extension of an existing house and associates site works.