Inishaellaun, Ballynacally, Ennis
Proposed development
To RETAIN as constructed, modifications to existing dwelling house and associated site work, approved under Planning Application P07/1472, including (1) the construction of a basement under existing house (2) change of window type on western side and rear elevations (3) omission of concrete barges over the two side gables and the front porch (4) revised location of the dwelling house, 10m closer to the front northern boundary (5) moving the rear south boundary back by 4.5m (6) alterations to finished ground levels to the rear of the dwelling (7) change of sewage treatment plant and other associated site works.
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 4 Jan 2019
- Residential units
- 1
- Floor area
- 289 m²
Timeline
Application received
1 Nov 2018
Decision due
4 Jan 2019
Decision: conditional
19 Dec 2018
Grant issued
28 Jan 2019
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
of (a) boundary wall as constructed on site, and (b) metal clad sheeting to roof of existing dwelling house, previous Planning Ref.: 21/1105
to renovate an existing dwelling which is a protected structure (RPS No.037), demolish an existing two storey extension constructed to the rear of the dwelling, construct a replacement three storey extension and to install a replacement effluent treatment system, all with associated site works and accessed by means of an existing entrance and driveway from the public road
to renovate an existing dwelling which is a protected structure (RPS No. 037) demolish an existing two storey extension constructed to the rear of the dwelling, construct a replacement three storey extension, and to install a replacement effluent treatment system, all with associated site works, and accessed by means of an existing entrance and driveway from the public road
for the construction of a new dwelling house with a carport, complete with a new entrance, sewage treatment system and ancillary works
to construct 1 no. Dwelling House and garage, provide a new site entrance and connect to new proprietary Waste Water Treatment System and connect to public services and to Lissycasey Group Water Scheme and carry out all ancillary site works
to construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works