Rose Cottage, Lisdaran, Co.Cavan
Proposed development
For the fully serviced single story extensions to the sides and rear of the existing dwelling, alterations to the existing dwelling, demolition of existing domestic garage, erecting a new detached domestic garage, the construction of a new vehicular entrance and driveway, the removal and closure of the existing vehicular entrance and the infilling/reinstatement of the existing entrance area, new entrance and frontage boundary wall, together with all associated site works
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 24 Nov 2026
- Residential units
- 1
- Floor area
- 158 m²
Timeline
Application received
30 Sept 2026
Last day for public submissions (est.)
Tue 3 Nov 2026
Decision due
24 Nov 2026
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (extension or alterations to a home) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
for alterations and extension to the existing dwelling, consisting of: (A) External alterations to the existing dwelling: Removal of 3 no. chimneys; replacement of the existing slated pitched roof with a standing seam metal roof; replacement of existing flat roofs with pitched metal roofs and gables; and external insulation of the existing dwelling. (B) Internal alterations and reconfiguration: Formation of a master en-suite bedroom in place of the existing kitchen/dining area; bathroom and dressing room in place of the existing living area; removal of the utility room and incorporation of this area into Bedroom 1; replacement of Bedroom 2 with a hall and utility/plant room; replacement of the existing bathroom with a pantry and store; removal of Bedroom 4 to increase the size of Bedroom 3; and conversion of the existing garage to a study. (C) Front / north-western elevation: Replacement of the existing garage door with French doors; upgrade of the flat roof over the front door; and provision of a stone finish around the front door and along the plinth. (D) Left-side / north-eastern elevation: Provision of new windows to the master bedroom and en-suite, and a rooflight to the dressing room. (E) Rear / south-eastern elevation: Provision of new windows to the master bedroom; replacement of the existing back door with a window to Bedroom 2; provision of a rooflight to the bathroom; and removal of the existing rear study door. (F) Right-side / south-western elevation: Replacement of an existing window with a utility door and provision of a rooflight to the hall. (G) Proposed split-level flat-roof extension to the right-side / south-western elevation comprising: At basement level: garage, Bedroom 4 with dressing room, shower room, playroom and hall. At ground-floor level: open-plan kitchen/dining area with staircase. (H) Associated site works: Proposed retaining walls and upgrade of the existing wastewater treatment system and percolation area. (I) Services: Connection to existing services and all associated site works
for erecting ground mounted photovoltaic solar panels and all associated site works
for the erection of a single storey Day Activation Unit (DAU) for disability services, parking, site entrance, bicycle spaces, bin storage, service connection and all associated site development works
for the erection of a single storey Day Activation Unit (DAU) for disability services, parking, site entrance, bicycle spaces, bin storage, service connection and all associated site development works
to erect an all-weather multipurpose pitch in replace of existing grassed pitch to include perimeter fencing, flood lighting, changing facilities, handball / activity wall, half basketball court and all associated works
for the construction of a standalone bus shelter and all ancillary site development works