Lands to the West of Mannok Cement WorksBallyconnell County Cavan., In the Townlands of Mucklagh Gortoorlan and Snugborough, Ballyconnell County Cavan
Proposed development
- RED III - for a solar energy development comprising ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, underground cabling, temporary construction compound, erection of 3 Transformer stations (11)kV, laying of a permeable gravel access tracks, widening of existing field entrances, erection of CCTV poles and cameras, erection of entrance gates and perimeter fencing, landscaping and biodiversity measures all associated ancillary development works, for the purpose of generation renewable energy electricity. Planning Permission is sought for a 40-year operation of the solar farm following which the site will be decommissioned, all development removed and the Site restored to agricultural lands. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 22 Jul 2026
Timeline
Application received
14 Jan 2026
Council asked for further information
16 Mar 2026
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
16 Jun 2026
Decision due
22 Jul 2026
Decision: conditional
22 Jul 2026
Appeal lodged (PL-501871-CN-26)
Not available
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for a minor amendment to planning application No. 2360009 to reposition the (A) site substation & (B) temporary site compound
for a minor amendment to planning ref: 23/60009 relating to the permitted substation compound at Tullyhaw, Ballyconnell, County Cavan We are seeking a minor amendment to: • (A) the site substation, and • (B) the temporary site compound. Please see appendix for site location maps and drawings Substation relocation is required because: • The original location conflicts with turbine delivery vehicle swept paths and access gradients as identified during detailed design. • Significant additional fill would be required to match road levels and overcome existing site contours and drainage constraints. • The new position avoids a deep field drain, provides a better route for the interconnector cable, and improves both security and health & safety for long-term maintenance access. Temporary compound relocation is required because: • The approved location has the same gradient and access issues as the original substation site. • The new location provides safer, more secure access with reduced cut/fill. • While temporary, the compound must safely accommodate offices, welfare facilities, storage, and staff parking until reinstatement after construction The proposed change does not alter the overall scale, use or purpose of the proposed development and will not give rise to any additional environmental or visual impacts. An updated site layout drawing is attached to the amendment application
for thirty-year permission for a grid system services facility located at Gortawee, Mucklagh, Ballyconnell, County Cavan, over an area of c.3.46 hectares. The proposed works shall consist of the installation and operation of energy storage units, including 1no. customer switchgear containers and compound, which will be connected to the national grid via the adjacent Gortawee 110kV substation infrastructure, electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure
to apply for thirty-year permission for a grid system services facility located at Gortawee, Mucklagh, Ballyconnell, County Cavan, over an area of c.3.46 hectares. The proposed works shall consist of the installation and operation of energy storage units, including 1no. customer switchgear containers and compound, which will be connected to the national grid via the adjacent Gortawee 110kV substation infrastructure, electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land
for thirty-year permission for a grid system services facility located at Gortawee, Mucklagh, Ballyconnell, County Cavan, over an area of c.3.46 hectares. The proposed works shall consist of the installation and operation of energy storage units, including 1no. customer switchgear containers and compound, which will be connected to the national grid via the adjacent Gortawee 110kV substation infrastructure, electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land
for development consisting of: o The construction of one Enercon 138 wind energy converter on an 99m tower with an electrical rating of 4.2MW and an overall tip height of 169m; o The construction of the wind energy converter foundation, hardstanding and assembly area; o Provision of a site entrance and an access track within the site; o Construction of an on-site 20kV substation and underground electrical cable; and o All associated site development and ancillary works