Holborn Hill / Barrack Lane, Belturbet, Co Cavan
Proposed development
For EXTENSION OF DURATION OF REF 20602 to 1)partially demolish and convert existing community centre (formerly Erne Ballroom / Palais and protected structure) to 2 no. one-bedroom apartments retaining the front façade of existing building, 2) erect 3 no. two-storey two-bedroom terraced houses, 3) erect 2 no. two-bedroom terraced bungalows (7 units in total) with connection to all public services and all associated site works. These works are to be carried out to protected structure CV44018 Erne Ballroom. Significant further information and revised plans have been submitted
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 7 Sept 2026
Timeline
Application received
14 Jul 2026
Decision due
7 Sept 2026
Decision: conditional
4 Sept 2026
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for demolition of existing storage shed, erection of two storey split level residential building comprising 2no. 2 bed units, bin store, carparking, new site entrance, connection to public services and all ancillary site works
for a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works to include for demolition of existing buildings. (b) The provision of a total of 12no. 2bed duplex apartment units in a single building. (c) Provision of associated car parking at surface level with provision of a new vehicular entrance to the proposed courtyard. (d) Provision of bin storage facilities, private amenity terraces and balconies. (e) Provision of internal access roads and footpaths and associated works to include for regrading of site levels and boundary treatments. (f) Provision of communal space area along with all hard and soft landscape works with public lighting, planting and boundary treatments. (g) Internal site works and attenuation systems which will include for provision of hydrocarbon and silt interceptors prior to discharge. (h) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul, water connections and ESB network connection
to construct bungalow, create new bellmouth entrance, site development works and connect to existing services
for (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 54no. residential dwellings which will consist of 3no. 2bed units, 47no. 3 bed units and 4no. 4bed units. The residential dwellings are two storeys in height. (c) The provision of a total of 4no. 1bed duplex apartment units. The duplex apartment units are two storeys in height. (d) Provision of associated car parking at surface level. (e) Provision of electric vehicle charge points with associated site infrastructure ducting throughout the site. (f) Provision of associated bicycle storage facilities at surface level throughout the site and bin storage facilities. (g) Creation of a new access point from the public road with ssociated works to include for a connections to the existing public footpath along with a pedestrian crossing point. (h) Provision of internal access roads and footpaths and associated works to include for regrading of site levels as required. (i) Provision of open space areas to include formal play areas along with all hard and soft landscape works with public lighting, planting and boundary treatments to include boundary walls, retaining walls, railings & fencing. (j) Internal site works and attenuation systems which will include for provision of a hydrocarbon and silt interceptor prior to discharge. (k) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul along with provision of a foul pumping station, water connections and ESB network connection to include for provision of a substation. A Natura Impact Statement (NIS) has been prepared - SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
for demolition of existing storage shed, erection of 2no. two Storey detached dwellings, new site entrance, carparking, connection to public services and all ancillary site works
for construction of 2 no. two storey dwellings with detached domestic garages, connection to existing services, realignment of entrance and access avenue from the Public Road and all associated siteworks