St Anne's Park, Drumbannan, Bailieborough
Proposed development
To erect lamp standards with LED heads to carpark and access with the provision of LED flood lighting to walking track to perimeter of Training Pitch, and ancillary works
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 7 Sept 2021
Timeline
Application received
14 Jul 2021
Decision due
7 Sept 2021
Decision: conditional
3 Sept 2021
Grant issued
12 Oct 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for the proposed diversion of existing River Lear watercourse within the site, including excavation of a new channel, redirection of flows, infilling of the redundant channel section and associated engineering works
for a 10-year duration planning permission is sought for works to upgrade the Bailieborough Wastewater Treatment Plant in the townland of Beckscourt, Bailieborough Co. Cavan. The proposed development consists of upgrades to the capacity of the existing WwTP. The proposed development consists of the following elements: (i) Demolition and replacement of existing Inlet works; (ii) SWO outfall from existing Storm Water Tank to be decommissioned; (iii) Proposed Dual Function Overflow outfall pipe connection from the WwTP inlet works to an existing drainage culvert pipeline; (iv) Provision of 1 no. new Storm Water Storage Holding Tank and associated SWO outfall pipe connection to the existing drainage culvert pipeline; (v) Provision of 1 no. aeration tank and 2 no. settlement tanks; (vi) Demolition of the existing oxidation ditch and clarifiers; (vii) Provision of below and above ground chambers (pump chambers and process drainage); (viii) Provision of service water pump sump (wash water recycle system to clean equipment); (ix) Provision of new WwTP Primary Discharge outfall pipe connection to the existing drainage culvert pipeline; (x) Provision of 1 no. picket fence thickener and mechanical dewatering unit; (xi) Provision of chemical storage and dosing equipment for alkalinity boosting, phosphorus removal and sludge treatment; (xii) Provision of 1 no. building (Sludge dewatering building) of operating equipment and 2 no. of kiosks (Intake MCC Kiosk and Aeration Tanks MCC Kiosk); (xiii) Provision of odour control unit and associated above ground ductwork; (xiv) Provision of a back-up generator with diesel tank to be used in an emergency/power cut; (xv) Provision of an ESB substation; (xvi) Demolition of the existing tanks not used in the future design (i.e., inlet works, storm tank, oxidation ditch, circular clarifier and drainage/process pump sumps, polymer preparation building, sludge blanket thickener, sludge holding tank, scum chamber and sludge dewatering kiosk); (xvii) Extension of internal access road and provision of turning head to the northern end of the site; (xviii). Ancillary and associated development including: a) Equipment lifting gantries, access platforms; b) Provision of paved/pebble area within the site; c) Landscaping works d) Replacement of site fence; e) Mechanical and electrical service connections; (xix) Installation of south facing Solar PV Panels; (xx) Retaining wall to the northern part of the site and entrance of the site. A Natura
for (i) Demolition and replacement of existing Inlet works; (ii) SWO outfall from existing Storm Water Tank to be decommissioned; (iii) Proposed Dual Function Overflow outfall pipe connection from the WwTP inlet works to an existing drainage culvert pipeline; (iv) Provision of 1 no. new Storm Water Storage Holding Tank and associated SWO outfall pipe connection to the existing drainage culvert pipeline; (v) Provision of 1 no. aeration tank and 2 no. settlement tanks; (vi) Demolition of the existing oxidation ditch and clarifiers; (vii) Provision of below and above ground chambers (pump chambers and process drainage); (viii) Provision of service water pump sump (wash water recycle system to clean equipment); (ix) Provision of new WwTP Primary Discharge outfall pipe connection to the existing drainage culvert pipeline; (x) Provision of 1 no. picket fence thickener and mechanical dewatering unit; (xi) Provision of chemical storage and dosing equipment for alkalinity boosting, phosphorus removal and sludge treatment; (xii) Provision of 1 no. building (Sludge dewatering building) of operating equipment and 2 no. of kiosks (Intake MCC Kiosk and Aeration Tanks MCC Kiosk); (xiii) Provision of odour control unit and associated above ground ductwork; (xiv) Provision of a back-up generator with diesel tank to be used in an emergency/power cut; (xv) Provision of an ESB substation; (xvi) Demolition of the existing tanks not used in the future design (i.e., inlet works, storm tank, oxidation ditch, circular clarifier and drainage/process pump sumps, polymer preparation building, sludge blanket thickener, sludge holding tank, scum chamber and sludge dewatering kiosk); (xvii) Extension of internal access road and provision of turning head to the northern end of the site; (xviii). Ancillary and associated development including: a) Equipment lifting gantries, access platforms; b) Provision of paved/pebble area within the site; c) Landscaping works d) Replacement of site fence; e) Mechanical and electrical service connections f) Landscaping works; (xix) Installation of south facing Solar PV Panels; (xx) Retaining wall to the northern part of the site and entrance of the site. A Natura Impact Statement will be submitted to the planning authority with the application
for the retention of the change of use of an agricultural storage shed granted planning under Reference Number 2086 to a commercial storage building and all ancillary site development works
for (1) New milk intake extension, clean in process station, pipe bridge, installation of 5 No additional milk silos, and 1 No. silo for water reuse (2) the construction of a new internal road, (3) works to the public road involving widening of the Knockbride Road (L3515), (4) relocation of contractor containers and storage units on site, (5) relocation of existing site entrance to include traffic control entrance barriers & gates, (6) new staff, tanker and contractor parking areas including EV Charging points (7) new weighbridge, (8) boundary, landscape treatments and all ancillary works, (9) demolition of part of existing milk intake building, (10) new pedestrian crossing on the Knockbride Road (L3515), (11) new drainage and construction of underground attenuation drainage system (12) new upgraded Class 1 oil water separator (13) Rainwater Harvesting tank (14) new electrical switch room and admin office. The site currently operates under EPA License (Reg no. P0406-05.).
For (1) New milk intake extension, clean in process station, pipe bridge, installation of 5 No additional milk silos, and 1 No. silo for water reuse (2) the construction of a new internal road, (3) works to the public road involving widening of the Knockbride Road (L3515), (4) relocation of contractor containers and storage units on site, (5) relocation of existing site entrance to include traffic control entrance barriers & gates, (6) new staff, tanker and contractor parking areas including EV Charging points (7) new weighbridge, (8) boundary, landscape treatments and all ancillary works, (9) demolition of part of existing milk intake building, (10) new pedestrian crossing on the Knockbride Road (L3515), (11) new drainage and construction of underground attenuation drainage system (12) new upgraded Class 1 oil water separator (13) Rainwater Harvesting tank (14) new electrical switch room and admin office. The site currently operates under EPA Licence (Reg no. P0406-05.). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority in connection with the application. The planning application and EIAR may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the planning authority at Cavan County Council, Farnham Centre, Farnham Street, Cavan during its public opening hours and a submission or observation in relation to the application may be made to the authority in writing on payment of the prescribed fee within the period of 5 weeks beginning on the date of receipt by the authority of the application. Signed: Lakeland Dairies Co-Operative Society Ltd (Bailieboro)