Pottle, Poles, Co. Cavan
Proposed development
For the erection of a part two storey, part single storey dwelling house with attached carport, detached domestic garage, entrance gates and piers, waste water treatment system with percolation area and all associated site works. Significant further information and revised plans have been submitted to include amendments to the site boundary and relocation of the dwelling, attached carport and detached domestic garage on the site
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 22 May 2019
- Residential units
- 1
- Floor area
- 364.05 m²
Timeline
Application received
5 Sept 2018
Council asked for further information
24 Oct 2018
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
24 Apr 2019
Decision due
22 May 2019
Decision: conditional
17 May 2019
Grant issued
26 Jun 2019
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for detached domestic garage and all associated site works
for the purpose of infilling of lands at Broughderg, Poles, Co Cavan together with all ancillary structures and site works (incl. new temporary entrance) associated with the above proposed development. Natural materials of clay, subsoil and stone will be used in order to raise the levels and improve the lands for agricultural purposes. The lands will be covered with topsoil and reseeded with grass when completed
retain and continue alterations to external elevations of new extension (previous planning reg no 20/424) and carry out associated works
to 1. demolish single storey extensions at existing dwelling, 2. construct two storey and single storey extensions to side and rear of existing dwelling, 3. and carry out associated site works
for infilling of ground level by an average of 2m, using imported inert material consisting of natural materials of clay, sub soil & stone in order to raise the levels and improve the land for agricultural purposes together with all ancillary site works. The total quantity of material will not exceed 20,000 tonne (class 5 material as per third schedule part 2). The lands will be covered with topsoil and reseeded with grass when complete
for alteration and extension of existing single storey dwelling; works to include provision of pitch roof to existing garage, associated site development works, installation of new effluent treatment plant and soil polishing filter