Slieve Rushen, Snugborough, Ballyconnell
Proposed development
To retain an existing 30 metre high telecommunications support structure (previously granted permission under reference 11/288 which was a temporary permission for a period of 5 years which has expired) carrying antennas and link dishes together with associated ground based equipment and security fencing
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 14 Dec 2017
Timeline
Application received
20 Oct 2017
Decision due
14 Dec 2017
Decision: conditional
12 Dec 2017
Grant issued
25 Jan 2018
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to erect a single-storey extension to the side of an existing two-storey dwelling, together with alterations to the internal layout and external elevations, and all associated site works
for a minor amendment to planning application No. 2360009 to reposition the (A) site substation & (B) temporary site compound
for a minor amendment to planning ref: 23/60009 relating to the permitted substation compound at Tullyhaw, Ballyconnell, County Cavan We are seeking a minor amendment to: • (A) the site substation, and • (B) the temporary site compound. Please see appendix for site location maps and drawings Substation relocation is required because: • The original location conflicts with turbine delivery vehicle swept paths and access gradients as identified during detailed design. • Significant additional fill would be required to match road levels and overcome existing site contours and drainage constraints. • The new position avoids a deep field drain, provides a better route for the interconnector cable, and improves both security and health & safety for long-term maintenance access. Temporary compound relocation is required because: • The approved location has the same gradient and access issues as the original substation site. • The new location provides safer, more secure access with reduced cut/fill. • While temporary, the compound must safely accommodate offices, welfare facilities, storage, and staff parking until reinstatement after construction The proposed change does not alter the overall scale, use or purpose of the proposed development and will not give rise to any additional environmental or visual impacts. An updated site layout drawing is attached to the amendment application
for development consisting of: o The construction of one Enercon 138 wind energy converter on an 99m tower with an electrical rating of 4.2MW and an overall tip height of 169m; o The construction of the wind energy converter foundation, hardstanding and assembly area; o Provision of a site entrance and an access track within the site; o Construction of an on-site 20kV substation and underground electrical cable; and o All associated site development and ancillary works
for: 1) The construction of one Enercon 115 wind turbine on a 92m tower with an electrical rating of 4.2MW and an overall tip height of 149.86m; 2) The construction of the wind turbine foundation, hardstanding and assembly area; 3) Provision of a site entrance and an access track within the site; 4) Construction of an on-site 20kV substation and underground electrical cable; and 5) All associated site development and ancillary works Significant further information and revised plans has been submitted.
for development consisting of; The construction of one 4.2MW wind turbine with an overall tip height of up to 125m; The construction of the wind turbine foundation, hard standing and assembly area; Provision of a site entrance and an access track within the site; Construction of an on-site 20kV substation and underground electrical cable; and all associated development and ancillary works